Transport mechanism of the installation and maintenance of introduction



1 installation
(1) Machine Introduction
The unit consists of a set of structural level care stick composition supported on the frame transport mechanism. According to user needs can be equipped with various types of

belt conveyors, chain conveyors and stainless steel track plate conveyor and other products. Power equipment by the need to use various types of reducer, stepless electric

Machine or drive as a power source, stepless speed reducer do not have to stop. Part of complete equipment rack, lift sewing machine post rack. Base has two kinds of fixed and

mobile lifting mechanism and provides options for users, post rack can be equipped with various types of sewing machine, woven

Folding machine or paper wrapping system.Flat belt conveyor
(2) use
This device is intended for chemical, fertilizer, food, building materials, mining, feed, ports and other industries a variety of bag pocket seam is packing powder, particulate

matter and other materials transportation ideal sewing equipment.
(2) the use and maintenance of the machine
(A) the factory, in order for boxing, the main pillar lying down with baffle removal, installation, simply bolted to.
(2) The machine debugging, please place the horizontal conveyor, conveyor belt must be strained to an appropriate degree, usually in the middle of the hand lifting belt from the

belt rollers 200mm or so, long after the operation, the belt elongation, should be timely adjusted.
(3) Column sewing seat adjusted to the appropriate location, you can simply lock the handle.
(4) should be added bevel gear box oil, gear oil can be met. After 2,000 hours of work should be cleaned oil once.
(5) CVT first refueling operation 50 hours should be re-oil, after the oil change every 1000 hours after the first. Every 500 hours after the butter to the top of the nozzle

inside the gearbox filling oil once.drag chain conveyor
(6) CVT speed should be the first place to relax handwheel instructions marked on the body hex screws, and then turn the handwheel adjust the speed to be adjusted to the desired

speed, the then screws.
(7) Maintenance demolition stepless transmission, two rotating surface friction wheel parts are not allowed to hammer percussion, so as not to affect the product dent rotation.
Vulnerable part of its bearings after 2000 hours scrubbing, cleaning once.
(8) Upon completion or materials should be cleared up before work, and a variety of activities should be added to lubricating mechanical parts and rust.