Screw conveyor operation



1) Drive within the speed reducer lubricant application Gasoline HQ-10 (GB485-81) oil change once every 3-6 months. (2) jacketed screw conveyor spiral ends with lithium grease

inside the bearing, once every half note, 5 g. (3) screw machine hanging bearing, the choice of M1 category, including 80000 type bearing assembly has infiltrated the oil,

usually as little fuel; every 3-5 months, together with the hanging hanging shaft bearing body removed, remove the seal circle, the hanging bearing and 80000 bearing immersed in

molten lubrication with grease a cooling and re-installed to use, such as nylon ring damage should be replaced, for one year, using the above method maintenance once again, be

good results. (4) jacket hanging conveyor screw conveyor bearings, the choice of M2 category, class Note grease, greasing each hanging bush 5 g; temperature materials should be
Turn conveyor
used ZN2 sodium based grease (GB492-77); using self-lubricating bush, we should also add a small amount of grease. Jacketed screw conveyor irregularities occur during operation

should be checked, and the elimination of, not forced to operate.Check weigher