High-speed bucket elevator instructions for use outlined





High-speed bucket elevator mainly by the head, barrel, with observation window and overhaul barrel, ventilator tube, high strength plastic bucket and bucket belt, frame and

other components. Work, the material from the inlet evenly into the base of the bucket, and then was promoted to the head, when driving around bucket

Wheel, the material was dumped out into the container or the next step requires a device. Hoist's work can be divided into loading, transport and unloading up. The key is

loading and unloading. Bucket elevator is based on the advantages of vertical transport of materials, and thus small footprint; enhancing substances stable material

Given to enhance the high and transmission capacity, in fully enclosed drum machine work, not dust, there was a good seal and so on.air to water heat exchanger
A high-speed bucket elevator advantages
(1) a large adjustment range of the base, a large cross-sectional area of ​​the cylinder;
(2) high-density mounting high-strength plastic bucket;
(3) fiber weave strong tape;
(4) a cylinder air collusion;
(5) parabolic machine bonnet;
(6) to adjust the amount of discharge, the discharge condition of the nose was observed seat;
(7) first round plastic cover;
(8) with anti-reversal retaining device;
(9) to facilitate rapid overhaul with tight barrel.
2 constituting the
Head by the head seat, machine cover, bearing, shaft and round composition, machine head axis extending manufactured according to user requirements.
Power transmission methods are geared motor Direct coupling through Rao sex drive and geared motor through V-belt and pulley drive are two, two ways to choose from.hot water heat exchanger
With observation windows and access number and position of the cylinder can be set according to user's needs.
The base unit has opened the inlet forward and reverse feed port two, one feed port fitted into the hopper, and the other with the cover closed to the inlet. Above the base

plate can be installed after the removal of vacuum pipes.
Bucket with both ends of the joints using a special belt coupling bolts. Bucket and bucket to be used with a fixed bucket bolts, nuts and spring washers.
Bucket type with deep and shallow bucket bucket two, the former applies for granular materials, which applies to powdered materials.
3 installation methods and requirements
(1) Place the cradle in place at the installation site, to the base of the upper flange surface for the baseline correction levels, tighten the nut to the foot, according to the

technical design requirements, bottom barrel installed section by section, and use a plumb line straightening, final installation head.
(2) shall ensure that each pair of flange face no obvious dislocation and crannies. Between the flange can pad into 2mm thick adhesive foam pad or asbestos rubber pad to ensure

a good seal.
(3) Correction of shaft, it is horizontal, the upper shaft and the lower shaft correction, to the axis of the two in the same vertical plane.
(4) in a bucket bucket belt installed at one end with a bucket bucket with pre-drilled bolt holes connected (Connect the other end of the bolt holes in the bucket into the

chassis with rear ends of joints with drill ).
(5) Open the bonnet, will be installed with a bucket of the bucket from the nose into the ends, one end around the next round, in the maintenance window to connect bucket belt.

Bucket with connectors should be directed along the bucket belt running direction.
(6) to each of the bearings add a little oil.
4 Adjustment and commissioning
(1) Open the front seat the discharge door, clear the debris inside the machine.
(2) single plate moving with human week Check and tighten bolts and loose belt bucket bolts, adjust the position of bucket, bucket in the middle of the chassis.
(3) connected geared motor power, see bucket running direction is correct, if not properly be promptly corrected.
(4) No load test two hours. Should pay attention to adjust the tightness of the belt bucket. Bucket with a deviation is found, it should promptly handwheel operation base unit,

be corrected.
5. Operation
(A) routine examination should be made before driving, passim bolts, gear, safety devices, etc. is intact.
(2) when the lift car shown in the table should be controlled in the rated range.
(3) before stopping, you should stop feeding, and then continue to run one minute, the machine memory material shipped empty.
6 Maintenance
(1) 4 calcium based grease lubricated bearings. Open every three months, check the bearing and the bearing cap grease once a year split out bearing cleaning oil once.
(2) bucket and fasteners should be checked once a month and found damaged or loose should be promptly repaired, overhauled once annually.