Spiral classifier installation, operation and maintenance:
( A ) Installation : Machine no damage upon inspection , no loose screws , you can install . Classifier should be securely mounted in good pouring concrete foundation.

Foundation design should have a good supporting role to minimize the screws shear forces.
( Two ) operation on the spiral Telescopic belt conveyor classifier structure and working principle clear only after the manipulation of the machine.
1 , spirochetes rotation only after the start giving into pulp, gradually stingy to the ore .
2 , spirochetes are in working condition, such as the special case of failure, such as jam , overload ) must immediately stop, immediately spirochetes ascend out of the pulp

side , never allow spirochetes pressure Power Roller Conveyor in the pulp , the speed will be mine valve is opened , to avoid blockage.
3 , again, the required spiral down to a certain position , to rotate the spiral body .
4, the machine is in use , such as when you need to stop , you should stop feeding , finish grading process to be material , is no material before you can stop.
( Three ) Maintenance:
1, where the lubrication points are sodium or calcium based grease grease lubrication .
2 , each class should check whether the gear lubricant oil inside the needle engraved line, every six months for secondary oil.
3 , you should always check the lower seat or in the middle frame bearing, bearings , seals for wear , bearing is damaged , so that timely replacement.
4 , the bearings must be lubricated every 4 hours with a manual intervention to the bearing pressure injection pump high pressure oil to maintain the sealing performance of the

bearing .