Zhengzhou Modern Automation Equipment Co., LTD plastic plate chain conveyor using iron bending forming, conveyor transfer method using plastic chain plate, mainly for food and beverage delivery, or forced into continuous operation tempo control, cycle time according to the product adjustment process requirements, powered by ordinary motor, electromagnetic speed motor, inverter variable speed motor, mechanical variable speed motor, speed adjustable.
2013年6月2日星期日
Vertical bucket elevator construction job preparation and operating environment requirements
1 worker (a) prior to entering the construction workers started the installation skills, safety, environmental protection and other related aspects of training and education,
fully familiar with the equipment and equipment with a random drawing technical documents and related regulations. (2) Installation fitters, electricians, welders, crane workers
and other trained
And obtain the corresponding qualification certificates, certificates. (2) equipment, materials acceptance and custody (1) equipment inspection and acceptance: The device comes
into play, you need construction, construction, manufacturing, supervision and other relevant units to participate, according to the device name, type, size, position number, industrial conveyor
quantity list one by one
Inspection and acceptance, prepare equipment inspection records, if the check failed the inspection equipment shall not be installed. (2) equipment storage, storage: The
acceptance of the equipment, the establishment of sites for storage and protection, ready logo. (3) Installation of auxiliary materials inspection and acceptance: for safety
Mounted auxiliary materials such as: horn, anchor bolts, welding, etc. in accordance with the appropriate standards, inspection and acceptance requirements for construction
drawings, unqualified not be used. 3 Major construction equipment (1) selection of construction equipment to meet the requirements under the premise construction process, should
be combined with existing technology and equipmentindustrial belt conveyor
Occurrence and possible use of existing mechanical situation, give full play to the efficiency and use of construction machinery extent. (2) construction machinery mainly
include: cranes, forklift, hand truck, chain fall, jack. (3) selection of crane models should be based on the location of the device height, radius of gyration and equipment
Weight in OK. 4 Measurement and measuring instruments communicating tube, level, theodolite, box-type level gauge diameter of 0.35-0.5 steel wire, wire hammer, steel tape, steel
plate and steel ruler ruler. 5 operating conditions (1) drawing design technical tests have been completed, the construction program has been approved to open
Workers report has been approved. (2) on-site quality and safety management system has been established and has been running. (3) Equipment foundation retest pass around
obstacles clean, smooth road transport, environment desirable. (4) devices can meet the electricity, construction workers with certificates, equipment
Has been implemented. (5) the equipment itself and the rotating part of the re-inspection. 6 Results protection (1) vertical bucket elevator horizontal transport and lifting,
you should choose a reliable anchorage point, to avoid damage to the device. (2) lifting equipment should be used to check its performance in advance to ensure that work to
prevent
Ended Zhidongshiling equipment damage. Wire rope and lifting slings should be used to meet the requirements, to avoid accidents and damage its breaking device. (3) After the
installation is complete, the application of plastic film covering the vertical bucket elevator key parts to protect them. 7 Operating Environment Requirements (1) Field
Communicator
Wind civil basically completed the construction site, on-site waste cleanup completed, no dust pollution, ventilation, forced ventilation exhaust fan available if required. (2)
must be guaranteed spot lighting spot lighting needs of the construction, prohibit the use of portable lighting, solar lights, dangerous places night
Should be located between the safety alert red. Handheld voltage source must be safe. (3) on-site safety a. Strengthen erection and installation safety inspection, welding a
safety pile, a safety rope pull, pull in the necessary parts of the safety net. b. reinforce the proper use of helmets for construction workers, etc.
Education, the necessary incentive for the hole limb, good eye-catching logo and strict protective measures.