In the course of this machine should be fixed staff custody. Attendants must have a general technical knowledge and performance for bucket elevators familiar with those. Use of

this machine (the transmission characteristics of the material, working conditions, throughput, etc.) should strictly comply with all requirements of this specification.

The use of units of the machine should be developed, "equipment maintenance, overhaul safety procedures" to comply with cross-minders. Attendants must have a shift system,

carefully inspect hoist ministries work.check weighers

Bucket elevators should be fixed feeding device feeding the machine evenly. Feeding device feeding capacity should be in the present specification, "hoist the main technical

specifications" listed in the throughput range, not leaving much lower section feeding the material being transported blocked.

In operation, all doors must be completely closed. In the upper and lower section and view frequently open the door should install proper lighting equipment. Work process fails,

it must stop immediately, eliminate the fault. If not immediately eliminate defects, but the work nor had a big impact, when maintenance should be documented to be eliminated.

Attendants should always check each part of the work, but the absolute prohibition on the operation of the moving parts of the machine for cleaning and repair.

Lower section of the screw tensioning device should be adjusted to fit, keeping the tape have a working tension. Attendants should always observe the bucket elevator hopper tape

work, damaged hopper should be removed.Incline Belt conveyor

Attendants primary care bucket elevator is to observe their work status, cleaning, lubrication and checking adjustments sporadic work. Bucket elevators must under no-load

starting, after unloading parking.

Hoist except in the course of maintaining normal lubrication and replaceable damaged parts, the repair must be documented in use to eliminate defects, removal of damaged parts

and replace waste oil. Using units can be formulated according to the working conditions hoist maintenance cycle.