Brief overview of the belt conveyor installation

1 , connect the rack legs
2 , the annular Flat belt conveyor belt set into the side of the rack
4 , mounted on the carrier and upper roller
5, the correction of the belt into the ring set into the upper plate and the upper roller
6 , mounted on the inside of the Incline Belt conveyor endless belt drive roller
7 , the belt driven roller installed outside of the driving roller in an S -type .
8 , mounted on motor frame
9 , the motor is fixed to the motor frame , and fitted with sprocket and chain 10 attached to the lower roller
10 , electrical wiring and electrical control box wiring
11 , the fixed rack bolt 12 , so that the whole rack adjustable cup feet horizontally
12 , start running
13 , according to adjust the degree of deviation corresponding parts