Belt Conveyor Safety Tips

1 . Fixed belt conveyors should be installed on a solid basis ; mobile belt conveyor in operation before the wheels should be symmetrical wedge . Parallel multi-machine

operation, should stay out of each other more than 1m channel. There should be no prejudice around the conveyor working deposits.
2 . Before starting , you should steel roller conveyor adjust the belt tension , the buckle should be firm, bearings, gears, chains and other transmission parts should be good , roller and protective

devices should be complete, then zero or electrical protection should be well grounded , conveyor belt and the roller width should consistent .
3 . When you start , you should load operation , to be operating normally , even before loading . May not start after the first charge .
4 . Number of tandem feeding conveyor , the discharge end of the start sequence should start until all operating normally , before loading .
5 . When feeding, should flexible conveyor be aligned with the center and should reduce the height of the conveyor belt , reducing blanking on the conveyor belt, roller impact. Feeding should be

kept uniform.
6 . Operation, should always observe the mechanical functioning , when found conveyor belt slack or deviate phenomenon, should be adjusted down .
7 . Job, forbids any person from the conveyor belt passing below , or from above cross. Belt slip, prohibited by hand pulling . Prohibited operation to clean up or repair

operations.
8 . When conveying bulk materials , conveyor belts should be installed on both sides of the fence and other protective plate or device .
9 . Conveyor discharge height adjustment should be carried out in the parking . After the adjustment, tighten the coupling nut should and should plug in insurance sales .
10. Transportation needs to stop, you should stop loading, unloading the material on the conveyor belt to be exhausted only after the shutdown. Several conveyors in series

operation shutdown, should start on the discharge end of the shutdown sequence .
11 . When a power outage or other causes sudden shutdown , immediately cut off the power , the material on the belt removed, upon call or troubleshooting before then power

starts running.
12 . After the work is completed , the power should be disconnected, locked the power switch box , clear the conveyor sand, covered with a rain hood motor .