Maintenance of belt conveyors
1 day, check that the drive motor and reducer is abnormal;
2, check the belt is loose every day, and timely adjustments;
3 monthly checks whether the elongated conveyor belt, and timely adjustments;
4, the monthly check drum rotation is flexible, and timely repair;
5, the monthly check drive sprocket and chain of goodness of fit, adjust, and add the oil to the chain;
6 month control box with an air gun blow off Flexible skatewheel conveyor the dust, to prevent failure;
7, reducer after the first 100 hours of use to replace the cleaning internal gear oil, put new oil after every 2500 hours and then replaced once;
8, major maintenance once a year to check the extent of damage accessories.
2 gear off the chain: one, the chain is Extendable conveyor too long 2, the gear off the chain off, screw loose.
1, the chain chopped reassembly good deployment. 2, re key Shang Hao, matter eliminated.
2 belt slip: 1, belt adjustment is not good, too loose two belt is too long
A good tune belt tightness 2, increasing compaction roller deployment
2 belt ran: 1, poor deployment of drum 2, the re-commissioning roll angle
2 Transmission with sound: one, the chain does not teeth; 2 bearings in oil
1, chain wheel straightening 2, bearing oil
Zhengzhou Modern Automation Equipment Co., LTD plastic plate chain conveyor using iron bending forming, conveyor transfer method using plastic chain plate, mainly for food and beverage delivery, or forced into continuous operation tempo control, cycle time according to the product adjustment process requirements, powered by ordinary motor, electromagnetic speed motor, inverter variable speed motor, mechanical variable speed motor, speed adjustable.
没有评论:
发表评论