1 boot to be checked before the conveyor will not damage the conveyor belt obstacles. If you want to clear the obstacles out;
Before starting to observe the power supply is normal, necessary to measure the deployment to ensure that the equipment required for normal voltage; voltage instability will cause the conveyor can not be
To normal operation.heat exchange manufacturers
Equipment check is normal, you can turn on the computer;
4 Speed mode
a. inverter is used, please read the inverter's operating instructions
Boot sequence: Open the control box, the internal power switch is turned on (buckle up to the ON state) (power indicator lights) → start the start button on the panel → governor
Knob to adjust the spin to the appropriate position (clockwise faster counterclockwise slow) → make it uniform running; Do not use more than 50HZ. In the case of high load, try to
Can not be less than 25HZ or less continuous operation.vertical conveyor
Shutdown sequence: press the stop button on the tune outside of the control box panel → be a flat conveyor to stop and control box will open to the total internal power switch is turned off (
Buckle down to the OFF state).
b Electronic governor:
Off: Press the governor panel start button or the stop button, speed control knob is rotated to a suitable speed.
Flat conveyor maintenance
1. Checked daily drive motor and reducer is abnormal;
2. Every day to check whether the belt is loose;
3. Monthly check conveyor belt is stretched, and timely adjustment;
4. Monthly check drum rotation is flexible, and timely repair;
5. Monthly check the goodness of fit of the drive sprocket and chain, timely adjustment, and add the oil to the chain;
6. Monthly control box with an air gun to blow off the dust, to prevent failure;
7. Major maintenance done once a year, check the accessories the extent of damage.