Requirements shaftless screw conveyor

1 shaftless screw conveyor when no load should start , that no starting material in the cabinet after the start before automated sorting machine being fed to the conveyor .
2 When the initial feed conveyor , should be gradually increased. Feeding capacity until delivery of the rated capacity , feeding should be uniform, or likely to cause transport

of materials product plugs, hot water heat exchanger drive overload , so that the entire conveyor damage.
3 In order to ensure that no-load starting conveyor requirements , before stopping the conveyor should stop feeding, conveying the material in the cabinet to stop completely

before transporting finished running.
4 materials shall be transported in the bulk material mixing hard to avoid the death spiral card damage conveyor
5 regular testing work in the use of various parts of the state conveyors , attention is loose fasteners , if found loose parts . Should immediately tighten the screws , so that

re strong.
6 conveyor cover should not be removed while the machine is running, in order to avoid accidents.